The ashing furnaces LV 3/11 – LVT 15/11 are especially designed for ashing in the laboratory. A special air intake and exhaust system allows air exchange of more than 6 times per minute. Incoming air is preheated to ensure a good temperature uniformity.
- Tmax 1100 °C
- Heating from two sides
- Ceramic heating plates with integral heating element which is safeguarded against fumes and splashing, and easy to replace
- Air exchange of more than 6 times per minute
- Good temperature uniformity due to preheating of incoming air
- Only fiber materials are used which are not classified as carcinogenic according to TRGS 905, class 1 or 2
- Housing made of sheets of textured stainless steel
- Dual shell housing for low external temperatures and stability
- Optional flap door (LV) which can be used as work platform or lift door (LVT) with hot surface facing away from the operator
- Solid state relays provide for lownoise operation
- Defined application within the constraints of the operating instructions
- NTLog Basic for Nabertherm controller: recording of process data with USB-flash drive
Additional equipment
- Over-temperature limiter with adjustable cutout temperature for thermal protection class 2 in accordance with EN 60519-2 as temperature limiter to protect the furnace and load
- Observation hole in the door
- Process control and documentation via VCD software package for monitoring, documentation and control
| Tmax | 1100 °C |
| Inner dimensions in mm (w x d x h) | 200 x 170 x 130 |
| Volume in L | 5 |
| Outer dimensions in mm (w x d x h) | 385 x 420 x 790 |
| Connected load kW | 2.4 |
| Electrical Connection | 1-phase |
| Weight in kg | 35 |
| Minutes to Tmax | 120 |




Ulasan
Belum ada ulasan.